Several trades working in the same area at once, with stacked materials, overhead work, equipment, and low clearances. Most of the controls are scheduling and coordination.

Where it shows up

  • MEP trades sharing a corridor ceiling
  • Laydown areas next to active work
  • Low beams, ducts, and pipes at head height

Controls, most effective first

Work down the list. Rely on PPE only for the risk the controls above it cannot remove.

LevelControl
EngineeringPad and mark low overhead obstructions
Barricade active work zones
AdministrativeCoordinate who works where at the daily foreman meeting
Use the look-ahead schedule to avoid stacking trades
Material laydown plan with clear walkways
Housekeeping at the end of each shift
PPEHard hat for everyone in the area

PPE to list on the JHA

Hard hat1926.100High-visibility vest1926.201