JHA examples
Each example is a complete job hazard analysis with steps, hazards, controls, and scores before and after controls. Open one in the builder to change it for your project, or print it as a reference.
| Example | Main hazards | Steps | Worst before | Worst after | |
|---|---|---|---|---|---|
| Set and tie rebar on an elevated deck | Crane lifts and rigging, Falls from height, Cuts, lacerations, and impalement, Heavy lifting and manual handling | 5 | 15 | 5 | Edit in builder |
| Excavate a trench and lay storm pipe | Excavation and trenching, Heavy equipment and backing vehicles, Pinch points and caught-in or between, Hazardous atmospheres | 6 | 20 | 6 | Edit in builder |
| Saw cut and core a concrete slab | Respirable crystalline silica, High noise, Electrical shock and electrocution, Flying particles and eye injuries | 5 | 16 | 6 | Edit in builder |
| Hang drywall ceilings from a scissor lift | Aerial and scissor lifts, Heavy lifting and manual handling, Falling and overhead objects, Holes and floor openings | 6 | 15 | 5 | Edit in builder |