JHA Example: Set and tie rebar on an elevated deck

Crane delivery of rebar bundles, hand distribution, tying near the slab edge, and capping exposed bars on an elevated deck.

5 steps · highest risk before controls 15 · highest after 5

Job hazard analysis

Set and tie rebar on an elevated deck

Free Safety Report
ProjectSample project
Location / areaLevel 3 deck
Date2026-10-05
Company 
Supervisor / competent person 
Prepared by 
Permits requiredCrane lift plan
Weather / conditionsCheck wind against the crane manufacturer limits before picks

Job steps, hazards, and controls

#Job stepHazardsControlsBeforeAfter
1Land rebar bundles on the deck by craneCrane lifts and riggingLine of fireFalling and overhead objects- Qualified rigger and qualified signal person for each pick
- Inspect slings and hardware before use on each shift
- Tag lines to control bundles, and nobody under the load
- Land bundles on dunnage over beams, away from edges
153×5High51×5Moderate
2Distribute bars across the deck by handHeavy lifting and manual handlingSlips, trips, and same-level falls- Two-person carries for long or heavy bars
- Keep deck walkways clear of offcuts and banding
- Gloves with good grip
84×2Moderate42×2Low
3Place and tie bars near the slab edgeFalls from heightHoles and floor openings- Perimeter guardrail in place before edge work starts
- Covers on all deck openings, secured and marked HOLE
- Harness tied off to an approved anchor anywhere a guardrail section is removed
153×5High51×5Moderate
4Tie intersections with wireHeavy lifting and manual handlingCuts, lacerations, and impalement- Tie guns or long-handled tie tools to reduce bending
- Rotate workers between tying and placing
- Cut-resistant gloves
63×2Moderate42×2Low
5Cap exposed vertical dowels and barsCuts, lacerations, and impalement- Install impalement-rated caps or troughs on protruding bars as they are set
- Check caps at the end of each shift
123×4High41×4Low
Risk = likelihood × consequence (1 to 5 each).1 to 2 Negligible3 to 4 Low5 to 9 Moderate10 to 16 High20 to 25 Extreme

PPE required

✓Hard hat
✓Safety glasses with side protection
✓High-visibility vest
✓Work gloves
✓Safety-toe boots
Hearing protection
Face shield
✓Full-body harness and lanyard
Respirator
✓Cut-resistant gloves

Equipment in use

Ladder
Scaffold
Scissor lift
Boom lift
Forklift or telehandler
✓Crane
Excavator
Skid steer
✓Power tools
Powder-actuated tools
Torches or welding
Concrete saw
Generator
Air compressor

Emergency information

Nearest hospital 
Muster point 
Emergency contact 

Crew review. By signing, I confirm I reviewed this JHA before starting work.

#NameTrade / companySignature
1 
2 
3 
4 
5 
6 
Prepared by 
Email 
Phone 
Signature
Made with the free JHA builder at FreeSafetyReport.comRun this JHA on a phone and send it to Procore: responsevault.com

Scores are examples of the method on the 5x5 risk matrix. Score your own job with your crew. Hazard levels: 1 to 2 Negligible, 3 to 4 Low, 5 to 9 Moderate, 10 to 16 High, 20 to 25 Extreme.

Hazards in this example