JHA Example: Hang drywall ceilings from a scissor lift

Lift inspection, travel, loading board, overhead installation, fastening, and cleanup for ceiling drywall.

6 steps · highest risk before controls 15 · highest after 5

Job hazard analysis

Hang drywall ceilings from a scissor lift

Free Safety Report
ProjectSample project
Location / areaLevel 2 corridors
Date2026-10-05
Company 
Supervisor / competent person 
Prepared by 
Permits required 
Weather / conditions 

Job steps, hazards, and controls

#Job stepHazardsControlsBeforeAfter
1Inspect and function test the scissor liftAerial and scissor lifts- Pre-use inspection and function test each shift
- Only trained and authorized operators
82×4Moderate41×4Low
2Drive the lift to the work areaAerial and scissor liftsHoles and floor openingsCongested work areas- Walk the travel path for holes, drop-offs, and slopes first
- Floor opening covers secured and marked
- Spotter in congested areas
153×5High51×5Moderate
3Load drywall onto the platformHeavy lifting and manual handlingAerial and scissor lifts- Stay within the platform rated load
- Drywall lift or two-person lift for full sheets
- Stage board at platform height
93×3Moderate42×2Low
4Raise the platform and hang board overheadAerial and scissor liftsPinch points and caught-in or betweenFalling and overhead objects- Keep the gate and guardrails closed
- Watch overhead clearance to avoid crushing against structure
- Barricade the area below
- Do not climb or stand on the guardrails
153×5High51×5Moderate
5Fasten board with a screw gunHand and power toolsFlying particles and eye injuries- Inspect tools and cords before use
- Safety glasses
42×2Low21×2Negligible
6Cut board and clean up scrapsCuts, lacerations, and impalementSlips, trips, and same-level falls- Self-retracting knives, and cut away from your body
- Clean scraps as you go
63×2Moderate42×2Low
Risk = likelihood × consequence (1 to 5 each).1 to 2 Negligible3 to 4 Low5 to 9 Moderate10 to 16 High20 to 25 Extreme

PPE required

✓Hard hat
✓Safety glasses with side protection
High-visibility vest
✓Work gloves
✓Safety-toe boots
Hearing protection
Face shield
Full-body harness and lanyard
Respirator
✓Cut-resistant gloves

Equipment in use

Ladder
Scaffold
✓Scissor lift
Boom lift
Forklift or telehandler
Crane
Excavator
Skid steer
✓Power tools
Powder-actuated tools
Torches or welding
Concrete saw
Generator
Air compressor

Emergency information

Nearest hospital 
Muster point 
Emergency contact 

Crew review. By signing, I confirm I reviewed this JHA before starting work.

#NameTrade / companySignature
1 
2 
3 
4 
5 
6 
Prepared by 
Email 
Phone 
Signature
Made with the free JHA builder at FreeSafetyReport.comRun this JHA on a phone and send it to Procore: responsevault.com

Scores are examples of the method on the 5x5 risk matrix. Score your own job with your crew. Hazard levels: 1 to 2 Negligible, 3 to 4 Low, 5 to 9 Moderate, 10 to 16 High, 20 to 25 Extreme.

Hazards in this example

Other examples